Items accomplished in the past 4 evenings, since my last Sunday post:
Painted new diff cover bolts (front and rear)
Painted valve cover bolts and spreaders
Caulked rear of tub at tailgate
Designed dash panel locations for Front Locker, Compressor, Rear Locker, Front Light Bar, Interior Lights, Winch Power, Winch In/Out, 12v outlets (2), CB, CB mic, CB speaker
Installed hood latch into grill
Clear coated valve covers
Painted windshield knobs
Removed drive shaft u-joints
Sandblasted and painted drive shafts
Painted raised letters on gas filler neck shroud
Installed gas tank filler neck
Touched-up undercoating (frame, fender wells, etc)
Undercoated back side of diamond plate for roll cage
Sandblast air cleaner
Installed valve covers after painting
Replace all engine compartment fuel lines
Replace long bypass heater hose w/ flush kit
Fill radiator
Changed oil/ filter
Bed linered tub
| Drive shafts Before |
| Drive shafts After Sandblasting |
| Drive shafts Completed! |
| Decided to freshen the paint on the gas fill neck shroud. Covered in tape and cut the letter out with an Xacto knife by hand. |
| After installation, picture is a bit blurry. |
| Air cleaner sand blasted and ready for paint. |
| Jeep cleaned and ready for bed liner. |
| Bedliner all complete! |
| Painted valve covers installed, all new hoses, gas lines, etc. |
| Getting an oil change while the bedliner was drying. |
| Coming along, day by day! |
No comments:
Post a Comment