Monday, September 1, 2014

Almost Done! - Back on the Road Again!

We had a goal of having the Jeep back on the road over Labor Day weekend and we made it. We had a few small issues and took care of all of them. As you can see it looks like a completed Jeep.

Just need an exhaust system and to button up a few more items and we will be ready for Moab. Going to go try it out at a place here in Ohio next weekend to see how it performs and shake out any other issues we may see before we head West.



Here is what we completed since the last update:
  • Installed outside mirrors
  • Painted seat brackets
  • Wired ARB compressor to dash
  • Wired differentials to dash
  • Mounted CB antenna on bumper
  • Wired under hood light & switch
  • Connected water temp gauge
  • Connected oil pressure gauge
  • Mounted & wired fuse block
  • Wired +12v to new dash items
  • Mounted dash panel
  • Installed steering wheel
  • Tested dash electrical
  • Installed short exhaust pipes
  • Test started Jeep
  • Installed rock sliders
  • Lube seat brackets
  • Installed seats
  • Bled brake system
  • Installed wheels/tires
  • Tempered exhaust manifold paint
  • Test drive Jeep
  • Test gas & temp gauges
  • Installed interior lights
  • Wired interior lights to dash
  • Installed CB PA speaker
  • Adjust clutch
  • Adjusted steering stops
  • Installed new top and doors

No comments:

Post a Comment